News Room - Steel Industry

Posted on 20 Nov 2026

Shandong Steel to transfer 5.255 million tonnes of capacity quotas to Rizhao subsidiary

Shandong Iron and Steel Co., Ltd. (Shandong Steel) - the listed arm of the North China-based Shandong Iron & Steel Group - plans to transfer 4.005 million tonnes/year of ironmaking capacity quotas and 1.25 million t/y of steelmaking capacity quotas to its controlled subsidiary - Shandong Steel Group Rizhao Co., Ltd., in a move to support the proposed second-phase expansion of its coastal steel base, the company announced on November 18.

The transfer will be conducted through a privately negotiated agreement and will not include production equipment, according to the announcement. Its board had approved the proposal on November 16.

Capacity redistribution between two bases

The proposed transfer aims to address the capacity imbalance between Shandong Steel's Gangcheng works in Central Shandong's Jinan city and Rizhao works in Southeastern Shandong's costal city Rizhao, according to National Business Daily (NBD), a leading financial newspaper in China‌. The quotas are understood to come from surplus capacity at the Gangcheng base, the newspaper noted.

The existing Rizhao base, which was fully commissioned in April 2019, has designed annual capacities of 8.1 million tonnes of iron, 8.5 million tonnes of crude steel and 7.9 million tonnes of finished steel, according to online public information. Its steelmaking capacity therefore exceeds its ironmaking capacity by 400,000 tonnes/year, contributing to a longstanding shortage of hot metal. Shandong Steel also mentioned in its 2025 evaluation report released this February that it had resorted to external hot metal purchases and other measures to lift production.

Meanwhile, the Gangcheng base has had surplus capacity. Shandong Steel said in 2024 that its Gangcheng base had around 7 million tonnes/year of crude steel capacity, while annual output in 2021-2023 ranged between 6.32 million and 6.62 million tonnes, according to NBD. The company subsequently cancelled plans to build a 3,800-cubic-metre blast furnace and two 100-tonne converters, together with associated facilities, involving an investment of about 3.1 billion yuan, NBD noted.

Shandong Steel said the proposed transfer constitutes an internal resource restructuring. Upon completion, the quotas will remain within its consolidated reporting scope and represent compliant capacity, with no impact expected on the group's current consolidated total profit, according to the announcement.

Rizhao phase-two project remains at preparatory stage

The quotas are intended for the Phase II project of the Rizhao steel base.

Based on online information, the Phase II project of the Rizhao steel base is currently in the preliminary planning stage. It is scheduled to start construction in November 2027 and be completed in November 2030.

Notably, the project is said to be co-invested by Baoshan Iron & Steel Co., Ltd. (Baosteel) and Shandong Steel's Rizhao subsidiary, which are now jointly reviewing its feasibility report.

Previously, Hu Wangming, Chairman of China Baowu, had been reported to visit the Rizhao base to conduct a survey in March. Hu required that the Rizhao Phase II project be advanced steadily, with strengthened strategic planning and a commitment to action, according to online reports.

Baosteel's investment commitments remain unclear

The proposed transfer also raises questions about how the costs and benefits of the second-phase project will be allocated among shareholders.

In December 2023, Baosteel acquired a 48.6% stake in the Rizhao subsidiary from Shandong Steel for 10.703 billion yuan in cash. The acquisition was completed in January 2024. Currently Shandong Steel holds a 50.6% stake in the Rizhao subsidiary, while Baosteel is the second largest shareholder.

Currently the quotas have yet to be independently valued, and the transfer agreement and payment arrangements remain unsettled. How the capital expenditure for the second-phase project would be shared or whether Baosteel's investment commitments and entitlements to the additional capacity would change remain unknown.

Source:Mysteel Global