Combined Utilization of Condition Monitoring and Real-Time Numeric Simulation for a Condition Forecast- Oriented Maintenance Strategy

Posted on 10 September 2012
 

ArcelorMittal Indiana Harbor East hot strip mill more than doubled the campaign life of its 45-inch

vertical edger 0 (E0) gearboxes by replacing the conventional recirculating oil system with a continuously controlled lubrication system.


Source: Karl Nienhaus;Ralph Baltes;M Schultz;C Bernet



«  Back

Copyright © 2016 SEASI Site. All Rights Reserved.